• English
  • Hindi
  • Punjabi
  • Marathi
  • German
  • Gujarati
  • Urdu
  • Telugu
  • Bengali
  • Kannada
  • Odia
  • Assamese
  • Nepali
  • Spanish
  • French
  • Japanese
  • Arabic
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
Notification
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Noida
  • National
  • International
  • Entertainment
  • Business
  • Sports
CliQ INDIA > National > Mumbai-Ahmedabad high-speed rail project: Breakthrough of first mountain tunnel achieved in 10 months
National

Mumbai-Ahmedabad high-speed rail project: Breakthrough of first mountain tunnel achieved in 10 months

cliQ India
cliQ India
Share
2 Min Read
SHARE

Valsad (Gujarat) [India], October 5 (ANI): In a significant stride towards the ambitious Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor, the National High-Speed Rail Corporation Limited (NHSRCL) marked a major breakthrough on Thursday with the announcement of the successful completion of the first mountain tunnel in a period of 10 months.

Situated approximately 1 kilometer from Zaroli Village of Umbergaon Taluka in Valsad district, Gujarat, the tunnel’s structure encompasses the tunnel itself, the tunnel portal, and connecting elements such as the tunnel entrance hood.

According to officials, the construction of this vital tunnel employed the innovative New Austrian Tunnelling Method (NATM).

The process includes the precise marking of drill holes on the tunnel face, drilling of holes, charging of explosives, controlled blasting, removal of muck (blasted rock pieces), and the installation of primary support.

This support comprises steel ribs, lattice girder, shotcrete, and rock bolts, tailored to the specific type of rocks as assessed by geologists after each blast.

Key features of the mountain tunnel include a total length of 350 meters, a tunnel diameter of 12.6 meters, a tunnel height of 10.25 meters, and a single-tube horse-shoe-shaped design. The tunnel will accommodate two tracks, contributing to the overall efficiency and capacity of the high-speed rail corridor, they said.

This accomplishment marks the commencement of a series of seven mountain tunnels that will be constructed utilizing the NATM Method, enhancing the progress of the Mumbai-Ahmedabad High-Speed Rail corridor towards its anticipated completion, officials added. (ANI)

, https://www.aninews.in/news/national/general-news/mumbai-ahmedabad-high-speed-rail-project-breakthrough-of-first-mountain-tunnel-achieved-in-10-months20231005231131

You Might Also Like

Bharti Airtel partners with SpaceX’s Starlink, shares surge amid market optimism | CliqExplainer
Australia–India Strategic Partnership Deepens as Penny Wong and S Jaishankar Strengthen Regional Cooperation During High-Level Dialogue in New Delhi | cliQ Latest
Victims died while being taken to hospital: Gopalganj DM on stampede at Durga Puja pandal
World Cup Final: Indian Railways start special Vande Bharat between Mumbai to Ahmedabad
Mamata Banerjee Agrees to Doctors’ Demands; Key Officials to be Removed | BulletsIn

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Telegram Copy Link Print
Share
What do you think?
Love0
Sad0
Happy0
Angry0
Wink0
Previous Article Godrej Group and Mumbai First Unveil Sohrab Pirojsha Godrej Environment Award to Honor Environmental Excellence
Next Article Prithviraj Sukumaran, Mohanlal begin shooting for 'L2E- Empuraan'
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad imageAd image

Latest News

Bengal Falta Repoll 2026: Massive Security Deployment After Election Controversy | Cliq Latest
National
May 21, 2026
Peddi Promotion Event In Bhopal: Ram Charan And AR Rahman Ready For Mega Show | Cliq Latest
Entertainment
May 21, 2026
Junior NTR Dragon Teaser Out: NTR Stuns Fans With Intense Assassin Avatar | Cliq Latest
Entertainment
May 21, 2026
KKR Vs MI IPL 2026: Manish Pandey And Bowlers Revive Kolkata Playoff Dream | Cliq Latest
Sports
May 21, 2026

//

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

Sign Up for Our Newsletter

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Follow US

Follow US

© 2026 cliQ India. All Rights Reserved.

CliQ INDIA
  • English – अंग्रेज़ी
  • Hindi – हिंदी
  • Punjabi – ਪੰਜਾਬੀ
  • Marathi – मराठी
  • German – Deutsch
  • Gujarati – ગુજરાતી
  • Urdu – اردو
  • Telugu – తెలుగు
  • Bengali – বাংলা
  • Kannada – ಕನ್ನಡ
  • Odia – ଓଡିଆ
  • Assamese – অসমীয়া
  • Nepali – नेपाली
  • Spanish – Española
  • French – Français
  • Japanese – フランス語
  • Arabic – فرنسي
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?