• English
  • Hindi
  • Punjabi
  • Marathi
  • German
  • Gujarati
  • Urdu
  • Telugu
  • Bengali
  • Kannada
  • Odia
  • Assamese
  • Nepali
  • Spanish
  • French
  • Japanese
  • Arabic
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
Notification
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Noida
  • National
  • International
  • Entertainment
  • Business
  • Sports
CliQ INDIA > Business > KCP Hands Over Integrated Air Drop Test – Crew Module Structure to ISRO, Meant for Gaganyaan Mission
Business

KCP Hands Over Integrated Air Drop Test – Crew Module Structure to ISRO, Meant for Gaganyaan Mission

cliQ India
cliQ India
Share
4 Min Read
SHARE

NewsVoir

Chennai (Tamil Nadu) [India], October 9: The Chennai-based KCP – Heavy Engineering Unit handed over the first Integrated Air Drop Test – Crew Module structure (IADT-CM) to Indian Space Research Organisation (ISRO) here today. Dr. V.L. Indira Dutt, Chairperson and Managing Director, The KCP Group handed over the structure to Mr. R. Hutton, Acting Director, Human Space Flight Center, ISRO, at a function held at KCP-Heavy Engineering Unit’s integrated facility in Thiruvotriyur.

ISRO had earlier placed an order with KCP for the fabrication of two IADT crew module structures, both meant for the demonstration of its Technology Preparedness levels before carrying out Gaganyaan spacecraft, India’s first human space flight programme. The first IADT-CM is fabricated at KCP’s integrated facility for heavy casting, machining, and fabrication in Thiruvotriyur. The second one will be supplied to ISRO by March 2024.

The first IADT-CM weighs 3,120 kg and measures 3.1 diameter and 2.6-meter height. It is made of light alloy (aluminum) and 15CDV6 steel. The structure comprises more than 100 components that were joined together with welding, riveting and threaded fastening techniques. It will accommodate major subsystems like parachute system, pyros, avionics, and buoyance augmentation system.

While ISRO designed the IADT-CM structure, KCP-Heavy Engineering Unit fabricated and realised it at its in-house facilities. The fabrication of the structure is a challenging job, involving critical forming, precision machining, and stringent assembly required of both aluminum and high strength steel. Thanks to KCP’s infrastructure and skilled workmanship the realisation of this critical hardware is made possible.

ISRO’s Gaganyaan Mission envisages launching a crew of two to three members to an orbit of 400 km for a 3-day mission and bringing them back safely to the earth by facilitating the landing in Indian sea waters. The spacecraft mainly consists of Crew Module and Service Module. The CM structure, fabricated at KCP, simulates the shape and size of the actual Gaganyaan crew module. The Integrated Air Drop Test will be performed using an Indian Air Force helicopter by taking the Crew Module structure to an altitude of 3.6 to 4 km to validate the deceleration system (parachute & pyro’s) performance.

KCP – Heavy Engineering Unit, Chennai, supplies equipment for the core engineering sector (such as cement, sugar, mineral, power & steel), oil & gas industries and Indian defence, space and nuclear establishments. It has an integrated facility for heavy casting, machining & fabrication under one proof.

KCP has been in association with ISRO for the past three decades and supplies flight hardware for rocket vehicles like motor cases, nozzle divergent and inter stage structures. KCP supplied heavier ground parts for propellant casting & vehicle launching facilities like Mobile Launch Pedestal and 7.0m Dia Vacuum Chamber. It shows KCP’s presence in every sphere of Space. The company is planning to expand its facilities to participate in a larger way in ISRO’s future programmes. Specifically, it is planning to set up a precision machining unit and looking at the bigger diameter rocket motor casing and also the inter-stage and tank structure fabrication for ISRO’s Next Generation Launch Vehicles.

(ADVERTORIAL DISCLAIMER: The above press release has been provided by NewsVoir. ANI will not be responsible in any way for the content of the same)

Click Here for more news: https://www.youtube.com/@cliQIndia

You Might Also Like

China accounted for 80% of global EV sales growth in 2024 : IEA report
Food inflation will moderate soon, higher inflation may delay rate cut: Experts on June inflation
Formovie Unveils the Revolutionary Cinema EDGE Projector
Basilic Fly Studio Welcomes Zameer Hussain as COO and Global EVP to Drive Innovation and Global Expansion
Software Technology Parks of India, Apiary CoE Launches Pollen Propel Pre-Incubation Program to Promote Blockchain Startup Ecosystem

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Telegram Copy Link Print
Share
What do you think?
Love0
Sad0
Happy0
Angry0
Wink0
Previous Article Diaz, Apuia help Mumbai City FC clinch first home win against Kerala Blasters FC
Next Article Two minor sisters found murdered in UP's Etawah
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Stay Connected

FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad imageAd image

Latest News

Bengal Falta Repoll 2026: Massive Security Deployment After Election Controversy | Cliq Latest
National
May 21, 2026
Peddi Promotion Event In Bhopal: Ram Charan And AR Rahman Ready For Mega Show | Cliq Latest
Entertainment
May 21, 2026
Junior NTR Dragon Teaser Out: NTR Stuns Fans With Intense Assassin Avatar | Cliq Latest
Entertainment
May 21, 2026
KKR Vs MI IPL 2026: Manish Pandey And Bowlers Revive Kolkata Playoff Dream | Cliq Latest
Sports
May 21, 2026

//

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

Sign Up for Our Newsletter

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Follow US

Follow US

© 2026 cliQ India. All Rights Reserved.

CliQ INDIA
  • English – अंग्रेज़ी
  • Hindi – हिंदी
  • Punjabi – ਪੰਜਾਬੀ
  • Marathi – मराठी
  • German – Deutsch
  • Gujarati – ગુજરાતી
  • Urdu – اردو
  • Telugu – తెలుగు
  • Bengali – বাংলা
  • Kannada – ಕನ್ನಡ
  • Odia – ଓଡିଆ
  • Assamese – অসমীয়া
  • Nepali – नेपाली
  • Spanish – Española
  • French – Français
  • Japanese – フランス語
  • Arabic – فرنسي
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?