• English
  • Hindi
  • Punjabi
  • Marathi
  • German
  • Gujarati
  • Urdu
  • Telugu
  • Bengali
  • Kannada
  • Odia
  • Assamese
  • Nepali
  • Spanish
  • French
  • Japanese
  • Arabic
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
Notification
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Noida
  • National
  • International
  • Entertainment
  • Business
  • Sports
CliQ INDIA > National > Karnataka: Power supply cut off at Chinnaswamy Stadium over fire safety violations; HC pulls up BESCOM
National

Karnataka: Power supply cut off at Chinnaswamy Stadium over fire safety violations; HC pulls up BESCOM

cliQ India
cliQ India
Share
4 Min Read
SHARE

Bengaluru (Karnataka) [India], July 1 (ANI): The Bengaluru  Electricity Supply Company (BESCOM) has disconnected the electricity supply to the M Chinnaswamy Stadium, which is managed by the Karnataka State Cricket Association (KSCA), due to non-compliance with fire safety regulations.

This action was taken after the Director General of the Department of Fire and Emergency Services wrote to the BESCOM Managing Director, directing the disconnection of the stadium’s electricity for failing to implement recommended fire safety measures.

Currently, power to the stadium is being supplied through generators.

Earlier, the Karnataka High Court had criticised BESCOM for continuing to provide electricity to the stadium despite clear violations of fire safety protocols. The matter came up during the hearing of a petition filed by KSCA challenging the disconnection notice issued by BESCOM.

A single-judge bench of Justice S Sunil Dutt Yadav heard the petition filed by the KSCA challenging the notice issued by BESCOM regarding the disconnection of electricity.

The counsel for the petitioner said, “Some developments have taken place after BESCOM issued the notice and we filed the application in court. On June 12, BESCOM issued a notice of disconnection and disconnected the electricity. An application was filed on June 17 challenging that. The electricity connection was restored on the same day.”

The bench noted that BESCOM had supplied electricity even after knowing that all precautions were not followed by KSCA.

To this, BESCOM’s lawyer, Likhit, told the court that the electricity connection was restored based on KSCA’s request and would be disconnected again.

The bench then said that the government should issue a fire safety clearance letter. “If you provide electricity without consulting the government, the court will not remain silent. The disaster that has already occurred is enough. Who will be responsible if another mishap occurs? If fire safety measures are not taken, let the stadium remain in darkness. The only option left is to adopt fire safety measures to obtain an electricity connection. There should be zero tolerance for risks.”

KSCA’s counsel pleaded that appropriate steps were being taken and requested that BESCOM and the Fire and Emergency Services Department be instructed not to take any coercive action.

The bench responded, “The court will not say anything further in this matter. BESCOM counsel has given an oral assurance that they will disconnect the electricity connection. But first, ask the government. If the government instructs, it will be done. Otherwise, BESCOM will be held responsible for the mistake that has been made,” the bench warned.

After hearing the arguments, the bench issued notices to the BESCOM Managing Director, BESCOM Assistant Executive Engineer, and the Director General of Fire Safety and Emergency Services, and adjourned the hearing to July 15.

The Director General of the Department of Fire Safety and Emergency Services had instructed the Managing Director of BESCOM on June 10, 2025, to disconnect the power supply provided to KSCA since July 7, 2011, for failure to implement the fire safety precautions suggested in the department’s advisory letter dated May 11, 2023. Accordingly, BESCOM issued a notice of disconnection to KSCA on June 12. (ANI)

, https://www.aninews.in/news/national/general-news/karnataka-power-supply-cut-off-at-chinnaswamy-stadium-over-fire-safety-violations-hc-pulls-up-bescom20250701021442

You Might Also Like

BJP appoints Sanjay Jaiswal as chief whip in Lok Sabha amidst parliamentary tensions | CliqExplainer
"Public morality demands one must quit": Former SC judge Justice Ajay Rastogi on demands for Arvind Kejriwal's resignation
CM Pushkar Singh Dhami reaches Mumbai's for road show following 'Uttarakhand Global Investors Summit-2023'
"People voted for change…:" Congress leader Harish Rawat
Chandrababu Naidu’s Swearing-In as Andhra Chief Minister Postponed to June 12 | CliqExplainer

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Telegram Copy Link Print
Share
What do you think?
Love0
Sad0
Happy0
Angry0
Wink0
Previous Article "There's more to come": Woakes cautions India of Stokes threat ahead of second Test
Next Article Jackie Shroff says he had "tears in eyes" after watching 'Tanvi The Great'

Stay Connected

FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad imageAd image

Latest News

Bengal Falta Repoll 2026: Massive Security Deployment After Election Controversy | Cliq Latest
National
May 21, 2026
Peddi Promotion Event In Bhopal: Ram Charan And AR Rahman Ready For Mega Show | Cliq Latest
Entertainment
May 21, 2026
Junior NTR Dragon Teaser Out: NTR Stuns Fans With Intense Assassin Avatar | Cliq Latest
Entertainment
May 21, 2026
KKR Vs MI IPL 2026: Manish Pandey And Bowlers Revive Kolkata Playoff Dream | Cliq Latest
Sports
May 21, 2026

//

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

Sign Up for Our Newsletter

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Follow US

Follow US

© 2026 cliQ India. All Rights Reserved.

CliQ INDIA
  • English – अंग्रेज़ी
  • Hindi – हिंदी
  • Punjabi – ਪੰਜਾਬੀ
  • Marathi – मराठी
  • German – Deutsch
  • Gujarati – ગુજરાતી
  • Urdu – اردو
  • Telugu – తెలుగు
  • Bengali – বাংলা
  • Kannada – ಕನ್ನಡ
  • Odia – ଓଡିଆ
  • Assamese – অসমীয়া
  • Nepali – नेपाली
  • Spanish – Española
  • French – Français
  • Japanese – フランス語
  • Arabic – فرنسي
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?