• English
  • Hindi
  • Punjabi
  • Marathi
  • German
  • Gujarati
  • Urdu
  • Telugu
  • Bengali
  • Kannada
  • Odia
  • Assamese
  • Nepali
  • Spanish
  • French
  • Japanese
  • Arabic
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
Notification
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Home
  • Noida
  • National
    • BulletsIn
    • cliQ Explainer
    • Government Policy
    • New India
  • International
    • Middle East
    • Foreign
  • Entertainment
  • Business
    • Tender News
  • Sports
    • IPL2025
  • Services
    • Lifestyle
    • How To
    • Spiritual
      • Festival and Culture
    • Tech
  • Noida
  • National
  • International
  • Entertainment
  • Business
  • Sports
CliQ INDIA > National > Assam CM inaugurates elevated South Bank Corridor of Guwahati-North Guwahati Bridge
National

Assam CM inaugurates elevated South Bank Corridor of Guwahati-North Guwahati Bridge

cliQ India
cliQ India
Share
6 Min Read
SHARE

Guwahati (Assam) [India], March 4 (ANI): As a part of Bikash Yatra, Assam Chief Minister Dr Himanta Biswa Sarma on Monday inaugurated, laid foundations and performed bhumi pujan of projects worth Rs 1,208 crore in Kamrup (M) district in different programmes held across the district.

CM Sarma also inaugurated a Elevated South Bank Corridor of Guwahati- North Guwahati Bridge involving an outlay of Rs 326.01 crore. The highlights of the project are it is a tree-lane flyover with two rotaries.

Special noise barriers have been installed to control noise pollution which is first-of-its-kind in the state. The corridor is 1.2 km length with 15.2 m width from Bhoothnath to Machkhowa.

The Chief Minister also laid the foundation of a 100 bed Azara District Hospital with a project cost of Rs. 116 crore. The hospital will have three operation theatres, 14 essential healthcare facilities including critical care, radiology etc.

He also performed bhumi pujan for the upgradation of existing 2-lane road to 4-lane road connecting LGBI Airport from VIP Junction to Dharapur Junction involving a project cost of Rs. 358 crore. The length of the road will be 9 KM with roundabouts at VIP junction SoS junction and Garal junction replacing existing ones at grade T/Y Junction.

During the day, the Chief Minister also performed bhumi pujan for Trumpet Interchange at Gauripur T Junction. The 5.482 KM project to be built with budgetary expenditure of Rs. 408 crore which will lead to better connectivity with nearby and remote areas and reduce accidents and commute time.

Speaking on the occasion, Chief Minister Dr. Sarma said that Assam Public Works Roads Department undertook the ambitious project for construction of 6-Lane extra-dosed PSC Bridge over the Brahmaputra connecting Guwahati and North Guwahati at a cost of Rs. 2608.69 crore.

“Prime Minister Narendra Modi laid the foundation stone of the Bridge on February 9, 2019. The project activities commenced from August 14, 2019. With the inauguration of the portion of the elevated corridor, traffic congestion near Bharalumukh would be reduced to a great extent. The corridor will enhance the cityscape by the river and reinforce the river bank. Once fully completed the entire stretch of the Guwahati-North Guwahati bridge over the Brahmaputra will be dedicated to the nation by Prime Minister Narednra Modi in the month of December this year,” the Chief Minister said.

The Chief Minister also said that with the inauguration of the elevated corridor, commuters coming from Adabari areas and going to Kachar Ghat can directly take the elevated corridor bypassing Bharalumukh.

Giving a snapshot of the latest infrastructural developments of Guwahati, Dr. Sarma said that the dedication of the Neelachal Flyover, Shraddhanjali Flyover, Dispur Super market Flyover, extension of Ganeshguri Flyover have led to the smooth traffic movement in the city.

He also said that the under-construction flyover at Kalapahar, and the one from Dighali Pukhuri to Bamunimaidan will lead to a total transformation of the traffic movement in the city.

CM Sarma also said that another elevated corridor from Pandu to Kamakhya Temple over the Brahmaputra is on the pipeline which will be materialized very soon.

Earlier in the day, the Chief Minister performed bhoomipujan for the upgradation of the existing 2-lane road to 4-lane road connecting Lokapriya Gopinath Bordoloi International Airport from VIP Junction to Dharapur Junction. Chief Minister also laid the foundation stone for the Rs 116-crore 100-bedded Azara District Hospital being built under the Assam State Secondary Healthcare Initiative for Service Delivery Transformation (ASSIST) scheme funded by the World Bank.

He also attended the bhoomipujan of the Rs 408-crore Trumpet Interchange at Gauripur T-Junction, totalling 5.482 Km in length, aimed at reducing traffic congestion on the bridge connecting Guwahati and North Guwahati.

Speaking on these occasions, the Chief Minister stated that the World Bank came forward with funding to upgrade 10 numbers of existing hospitals in the State to the level of district hospitals.

He said the government decided to include the Azara Community Health Centre into that list so that the population residing in and around the locality can enjoy the benefits of modern healthcare facilities nearby their homes without having to travel to distant places. The Chief Minister said the government aims to complete the construction of the state-of-the-art hospital by 2026.

“The 8-storeyed building with total built-up area of 15,555 square meter shall have three numbers of operational theatres, along with a host of essential healthcare facilities, including critical, radiology, to name a few,” the Chief Minister added.

Chief Minister Sarma further added necessary steps for construction of a flyover at Rani would be taken. He also spoke about the government’s initiatives aimed at massive infrastructure development near Deepor Beel with the aim of boosting tourism potential of the Ramsar Convention site.

He further stated that the existing railway line passing through Deepor Beel shall be upgraded to elevated railway corridor so as to minimise casualties of elephants inhabiting in the nearby areas. (ANI)

, https://www.aninews.in/news/national/politics/assam-cm-inaugurates-elevated-south-bank-corridor-of-guwahati-north-guwahati-bridge20240304224242

You Might Also Like

Ahmedabad air India crash: AAIB probe reveals critical engine failures, pilot confusion in final moments | cliQ Latest
Ajit Doval says India has effectively countered terrorism, highlights decline in extremism and strengthened national security | cliQ Latest
WB: NHRC takes suo motu cognizance of reported beating of couple in Uttar Dinajpur
"BJP reverting to its core message" says Congress' Shashi Tharoor ahead of Ram Temple inauguration in Ayodhya
Congress worker murder case: Police finds bite marks, scratches on hands of accused

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Whatsapp Whatsapp Telegram Copy Link Print
Share
What do you think?
Love0
Sad0
Happy0
Angry0
Wink0
Previous Article India and France Hold Bilateral Dialogue on Disarmament and Non-Proliferation
Next Article Aamir Khan, Darsheel Safary reunite for a new project after 16 years, see pic

Stay Connected

FacebookLike
XFollow
InstagramFollow
YoutubeSubscribe
TelegramFollow
- Advertisement -
Ad imageAd image

Latest News

Bengal Falta Repoll 2026: Massive Security Deployment After Election Controversy | Cliq Latest
National
May 21, 2026
Peddi Promotion Event In Bhopal: Ram Charan And AR Rahman Ready For Mega Show | Cliq Latest
Entertainment
May 21, 2026
Junior NTR Dragon Teaser Out: NTR Stuns Fans With Intense Assassin Avatar | Cliq Latest
Entertainment
May 21, 2026
KKR Vs MI IPL 2026: Manish Pandey And Bowlers Revive Kolkata Playoff Dream | Cliq Latest
Sports
May 21, 2026

//

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

We are rapidly growing digital news startup that is dedicated to providing reliable, unbiased, and real-time news to our audience.

Sign Up for Our Newsletter

Sign Up for Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

Follow US

Follow US

© 2026 cliQ India. All Rights Reserved.

CliQ INDIA
  • English – अंग्रेज़ी
  • Hindi – हिंदी
  • Punjabi – ਪੰਜਾਬੀ
  • Marathi – मराठी
  • German – Deutsch
  • Gujarati – ગુજરાતી
  • Urdu – اردو
  • Telugu – తెలుగు
  • Bengali – বাংলা
  • Kannada – ಕನ್ನಡ
  • Odia – ଓଡିଆ
  • Assamese – অসমীয়া
  • Nepali – नेपाली
  • Spanish – Española
  • French – Français
  • Japanese – フランス語
  • Arabic – فرنسي
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?